Sunday, October 6, 2013

Chinese Privet Homestead Hero or Villian


I am in the process of trying to reclaim a strip of our homestead back from Chinese Privet. Chinese Privet is a highly invasive and quick growing species. On an interesting note, while trying to do research for this post I looked up this plant on the US Department of Agriculture site and it was not operational because of the government shutdown. HA HA.

Chinese Privet (Ligustrum sinense) is an evergreen shrub- even though it can reach a height of over 25 feet. Privet is propagated by seeds which can be spread by birds, by cuttings, and by new plants growing from the parent plants roots. Chinese Privet is a member of the olive family and is considered toxic to many animals. I have, however seen cows, horses, goats, and deer eat this plant with vigor and no negative results. When this plant is in bloom it is often covered with honey bees. I read in one place that privet blooms produce a bitter honey, but I have not found this to be the case.

 I am trying to clear a strip about 10 feet wide and 110 feet long or 1100 square feet. That is a good bit of ground no matter the size of the area you have. If you are like us and are working with a 1/2 acre homestead 1100 square feet is a huge part of your land. I have some plants that their trunks are close to 6 inches in diameter. The area is very thick with privet so there is a lot of biomass that will be accumulated. I cannot stand the thought of that much of a resource going to waste.

 I have used dead privet for wood in a camp fire, so that was my first thought. After a very brief internet search I found I was not the only one. In fact, it is reported that privet burns hotter than hickory. So the larger pieces can be used for firewood. I also thought about maybe using privet for carving. It cuts fairly well when green, but clogs anything other than straight edged tools. I do not suggest using a rotary tool on privet while green. Privet dries solid and hard. Based on my experience I would say it dries almost as hard as dogwood and is not easy to work at all.


Now we are down to just having to deal with the tops. We had a wood heater when I was a child and we never had enough small wood so I cut firewood to a much smaller diameter than a lot of people. What I have left to deal with is generally only a little larger in diameter than my thumb. Enter the small electric wood chipper. I had been looking for a wood chipper for a while, even tried to borrow or rent one and no one had one. I finally found one used. I will have a link to one that is very similar to mine at the end of the post. With the wood chipper I am able to turn what is left of the bushes into a very nice mulch/compost ingredient. As of right now I have 2 fairly large piles of wood chips waiting to be assigned their new duties. As I said above,privet dries hard and I have found that my chipper has a much easier time of grinding what is left while it is still green. It will take me a while to get it all done but I have figured out a way to use every part of the bushes I am taking out.



Here is the link I promised to an electric wood chipper. As you can see they are fairly affordable.


In everything you do try to minimize waist. In everything you do remember to...
Keep It Rural

By Gregg Carter

Tuesday, October 1, 2013

The Government Has Shut Down Now What?


I am sure most of you remember the hysteria that was going on before the sequester. Some were saying that it was going to cause massive economic problems. The sequester came and is still going on and guess what? Everything is still functioning. For most people the sequester hasn't changed anything.

For the most part the shutdown is going to be the same way. The mail is still going to run. Social Security checks will still be paid. The military is still on duty. Most average people will not notice a difference. Of the 3.3 million federal employees, only 800,000 have been placed on furlough. Now for those federal employees who are not salaried, this could hurt. Though most likely this pain will be temporary.

This is not the first time there has been a shutdown of the federal government. In 1995/96 the federal government was shut down for 21 days. How many of you remember that? I will be honest before I started researching this post, I did not remember. All of the people that were furloughed in 95/96 received every penny of their back pay. I repeat: THE WORKERS WHO WERE NOT ALLOWED TO GO TO WORK FOR 21 DAYS WERE PAID AS IF THEY HAD GONE TO WORK EVERY SINGLE DAY.

Okay, so now that we have that out of the way, how will the government shutdown affect you? If you are planning on going over seas and do not have a passport yet,you may have problems. You can expect long delays. If you are still expecting a tax return you will be waiting until after the shutdown is over. But you won't have to worry about an audit either. If you are wanting to get a class 3 firearms licence or a federal firearms licence you will see long processing delays. All national parks are closed and several smaller federal office buildings are closed. If you are about to retire you may see a delay in the start of your Social Security paperwork being processed. The one thing that will affect the largest number of people is the shut down of the WIC program.

WIC stands for Women  Infant Children. WIC is not food stamps, but it is very similar. WIC provides vouchers for food to pregnant  women and women with small children who earn below a certain dollar amount. The types of food that can be acquired through WIC is greatly restricted when compared to food stamps. The types of food that are commonly covered by WIC include: milk, formula, baby food, cheese, breakfast cereal, and things like that. This will have an impact on more people than all of the other things combined.

So you see for about 98% of people in the United States there will be no difference. So don't worry and....

Keep It Rural

By Gregg Carter

Like the Rural Economist on Facebook by clicking here.

Sunday, September 29, 2013

DIY or DIFM?

Are you a Do It Yourself person or a Do It For Me? Most people are a mixture of both. I know I am. I am very dominate DIY, but I am very willing to admit when I need to become a DIFM. There is nothing wrong with paying someone else to do something for you if you do not have the time or expertise to get the job done. If you are anything like me you have several projects going at the same time. Plus you have several more waiting to be put in the line up. How do you determine which ones to do yourself and which ones, if any, to hire out? We are going to take a look at how an asset manager would consult a business on which projects to subcontract and which to do in house.

First things first. We must prioritize our projects. There may be projects that seem critical, but may not be important. I know that sounds confusing so I will explain. There are things that instantly grab your attention, they almost scream at you "I need to be done!!". But does it really need to be done? Some things that are urgent are not important. If some children have rolled your yard (thrown toilet paper into every tree) you are not going to be able to ignore the fact that there are streamers of Charmin everywhere. Most people are going to want to clean it up immediately, it is urgent to clean that mess up, but is it really important? If you were to leave the toilet paper up there for a few days would it damage the trees or the yard? No. Does leaving the paper out there create a health risk? No. So is it really important? No, it really isn't, but it is urgent. (My wife after reading this said "But we would have to clean up the toilet paper right away."

If we take this lesson and apply it full scale things that are urgent and important will be done first. Things that are important will be done second and things that are just urgent will be done third or later. I was first introduced to this concept in a book by Stephen Covey 7 Habits of Highly Effective People. This book was the first time I had heard this concept explained in such a way. This was an incredible observation and I can tell you when I practice this things work out better. People sometimes get upset because what they see as urgent gets put off, but the result are incredible.

After we have prioritized out projects and determined which ones are important and urgent, which ones are important but not urgent and which ones are urgent but not important we have a clearer picture of what needs to be done and in what order.

Many times I will hire help to complete a project rather than hire someone to do the job for me. There are a couple of reasons I would rather hire assistance. (1) I can make sure that the project is done exactly the way I want it to be done. If the project is something I know a lot about I can hire someone with little or no experience and save some money as well as help teach someone how to do things. (2) If it is a project that I do not know a lot about I can hire someone who has more experience that I do and I will learn from them. I love to learn from someone who really knows what they are doing. When I can get an expert to help work with me on one of my projects I not only get the project done I gain knowledge.

Here are the reasons that I would advise hiring a project done:

  1. A contractor can do a superior job
  2. The job can be completed more quickly
  3. The job can be completed more cost effectively 
  4. Hiring a contractor frees you to do something else or even work on another project.
Now for my words of warning. I would never advise someone to hire a project done if they need to borrow money to complete the project. If you would have to borrow money I would advise to either wait on the project till you can save up the money to pay cash for the project or do it yourself a little at a time. I do not like debt. 

I would never let a contractor work on a project of mine unless I am certain that they have a full understanding of what I want done, what time table I expect and can communicate back to me what I want. Several years ago I hired a gentleman to do some excavation work for me. We sat down and talked out everything that I wanted done. I drew out a map of how and where I wanted everything. This project included putting in a drive and building up a raised flat surface as well a preparing a building pad. The day the excavation was supposed to start I worked all morning and was expecting to see some progress as soon as I arrived after work. Nothing. I was late when I got in so I thought I would give them a day or two to get with me. The next day the equipment was there but no work was done. The third day I could tell a little earth had been moved, but I needed this part done before I could get anyone else on the site. I called the operator and several times and did not get in touch with him. After a week of gradual progress on my site I took a day off of work to be able to see what was going on. 

The guy I hired finally showed up to start work at around 10 am. He worked for about an hour and a half and left. About two hours later he came back and worked for about an hour. He was getting ready to leave when I walked up on him. I do not remember the excuses he gave me, but he no longer worked for me. I hired another man to do the work who charged more per hour, but was finished with everything in three days.

The moral to the story is do your homework. Know what you want done and be able to communicate the scope of the project to a prospective contractor. Ask around for a recommendation for a contractor and above all else watch your contractor as closely as you can. 

Think big, plan well, pay your bills, and work hard. Above all .....

Keep It Rural

Like the Rural Economist on Facebook by clicking here

By Gregg Carter